Railways

Railways

As we are doing Railway Electrification in India. Only 80% of Railway Lines are electrified and 20 % is still to be electrified in coming time. In this financial year Railway wants to electrify 13000Km’s of Railway track and there is a parallel line which will be laid and will be there only for freight and will be dedicated freight corridor.in Addiction the metro lines in expected works and in Maintenance.
Trimurthi Hitech Company Pvt.Ltd

Major Type Of Contract We Implement

  • Design, Supply, Erection, Testing & Commissioning of Traction Overhead Equipment (ohe), switching station including additiona/alteration to the existing ohe in connection with conversion of existing mg track into bg track.
  • Design, Supply, Erection, Testing & Commissioning of 110/25KV traction sub station, feeding post and shunt capacitor bank.
  • Design, Supply, Erection, Testing & Commissioning of 33/25 KV & 33KV/750V DC traction substation.
  • Provision of auxiliary transformer at LC gates in connection with continuous track circuiting with automatic block signalling and provision of audio frequency track circuiting.
  • Coal project – railway siding – traction overhead equipments, modification to the existing ohe.
  • Replacement of winch type regulating equipment by three pulley regulating equipment.
  • Replacement of aluminium catenary wire by copper.